Developing Options For Upper Air Space Management Towards A Regional Air Traffic Management Facility For Pacific Island Countries

Published: 2015
Last Updated: 23 Apr 2024

The main body of this study is structured into five sections. These sections are:

  • Section 1: Pacific ATM Sector Background including descriptions about the nature of aircraft operations across the Pacific, current allocation of South Pacific Flight Information Regions, and current upper airspace ATM arrangements and revenue allocation models;
  • Section 2: Design Considerations for Private Sector Participation;
  • Section 3: Introduction of Three Proposed Options i.e., Shared ATM Service Provision, Regional ATS Contractor and Pacific Owned Provider;
  • Section 4: Description of Preferred Option;
  • Section 5: Implementation Aspects.
Document TypePPIAF Reports
LanguageEnglish
File TypePDF
ContributorsWorld Bank Group (WBG), PPIAF
RegionsEast Asia & Pacific

Translations